seeSUSTAINtec - b2b оnline platform
Sustainable Technologies

İltekno İleri Teknoloji Mühendislik ve Ticaret A.Ş.

Hall 5
A16
Turkey

November 2016


  • As of November, ILTEKNO has been awarded with the extension project of the cogeneration plant, in a textile factory located in Sakarya Turkey, which is also a former reference of Iltekno.
    Extension projects consists of 1 x MWM TCG 2032V16 natural gas fired genset (4,3 MWe) and waste heat recovery system.